Compare Equipment Go Back

Cat Switchgear
XQ570 Tier 4 Final - 455 ekW (568 kVA)

Enclosure Rating

Configuration IP4X - -

Operating Temperature

Operating Temperature 35 °C / 40 °C @ 1 hr, option for 0…50 °C (32…122 °F) - -

Dimensions

Standard Widths 600 mm for ABB Emax2 E2 1600 - 2500A. 750 mm for ABB Emax2 E4 3200 - 4000A. 1200 mm for ABB Emax2 E6 4000 - 6300A. - -
Standard Heights Heights include 100mm plinth with fork lift pockets, 1900 mm up to 3200A, 2200 mm for 400,2200 mm for PLC and control cabinets. Option for single point lifting on 4 corners with M10 swivel eyes. Standard sizes for shipping - -
Standard Depths 300, 450 & 750mm for controls and PLC cabinets. 900mm for fixed breakers. 1050mm for withdrawable breakers - -
Height - Without Trailer - 102 in -
Length - Without Trailer - 240 in -
Width - Without Trailer - 96 in -
Weight with Lube Oil and Coolant, Without Trailer - 24125 lb -

Technical Summary

Technical Summary Modular system enables any configuration Distribution Boards, Motor Control Centers & PLC Control cabinets. Accommodates fixed or withdrawable breakers. - -

Application

Application LV 380…480 VAC, 50 Hz, 3-Phase. - -

Modes of Operation

Modes of Operation Switchgear integration options for multi generator and utility synchronising, load sharing, Peak Lopping/Shaving, AMF, Changeover, Load bank connection, Protection relay etc. - -

Generator Set

Rating Prime - 455 ekW (568 kVA) -
Frequency - 60 Hz -
Voltage - 120 - 600 V -
Rating Standby - 500 ekW (625 kVA) -

Engine

Engine - Cat C18 -
Fuel - Diesel -

Fuel Consumption

100% Load 60Hz - 35.9 gal/hr -
75% Load 60Hz - 28.3 gal/hr -
50% Load 60Hz - 20.5 gal/hr -

Noise rating (with enclosure)

Sound Power @ 7 meters (23 feet) @ All Ratings - 74 dB(A) -
Add a Similar Product:
  • Cat EGP Switchgear Add
  • Cat XLM Switchgear Add
  • Cat Customizable Switchgear and Controls Add
  • Engine Paralleling and Integration Control (EPIC) Add
  • EMCP 4.4 Master Control Panel Add
  • Energy Capacity Expansion (ECE) module Add
  • Cat® BDP1000 Bi-Directional Power Inverter Add
  • Temporary Connection Boxes Add
  • Energy Time Shift (ETS) Module Add
  • XQ425 Add