Compare Equipment Go Back

Cat XLM Switchgear
Cat® BDP1000 Bi-Directional Power Inverter
Engine Paralleling and Integration Control (EPIC)

Technical Summary

Configuration Configurable PLC based switchgear capable of controlling and monitoring multiple generator sets, tie, utility and load breakers for utility paralleling applications - Remote modular paralleling control system (Master Control Panel for the first 2 generator sets and optional tie breaker, separate add-on control panels for up to 8 additional generator sets, utility paralleling control, and distribution control)
Modes of Operation Emergency Standby, Utility Import/Export, Peak shaving, and base load operations with redundant controls and components. Closed transition to/from generator power - Emergency Standby with redundant master control, Utility paralleling, peak shaving, and closed transition to/from Generator Power (with optional utility control panel)
Application LV and MV ( 208V - 38 kV Energy Storage System LV and MV (208V-27kV)
Module Type - Integral part of Power Grid Stabilization and Energy Time Shift modules -
Rated Power - 1000 kVA (1000kW 1PF) -

Generator Protective Devices

ANSI Protective Devices 15/25, 27/59, 81 O/U, 32, 40, 50, 51 - 15/25. 27/59, 81 O/U, 32, 40, 90 (Industrial Grade)

Utility Protective Devices

ANSI Protective Devices 15/25, 27/59, 81 O/U, 32, 40, 47, 50, 51, 86 - 15/25. 27/59, 81 O/U, 32,47 (Industrial Grade)

Environmental Parameters

Certifications IBS, CBC, UBC & OSHPD Certified - UL / cUL 508A
Control Panel Enclosure NEMA 1 or NEMA 3R, Freestanding Construction - NEMA 12
Operating Temperature 0 degrees to 50 degrees C - 0°C to 55°C
Storage Temperature -20 degrees C to +60 degrees C - -20°C to 60°C
Low Voltage Standards NEMA SG-5, CSA, ANSI C37.51, ANSI C37.20.1, UL 1558 or UL 891, NFPA 110, NFPA 99 and NFPA 70 - -
Medium Voltage Standards NEMA SG-5, ANSI / IEEE C37.20.2, CSA-C22.2 No. 31-M89, EEMAC G8-3.2, NFPA 70, NFPA 99 and NFPA 1110 - -
Add a Similar Product:
  • Cat Switchgear Add
  • Cat Customizable Switchgear and Controls Add
  • Cat EGP Switchgear Add
  • EMCP 4.4 Master Control Panel Add
  • Energy Capacity Expansion (ECE) module Add
  • Energy Time Shift (ETS) Module Add
  • XQ570 Tier 4 Final – 455 ekW (568 kVA) Add
  • Temporary Connection Boxes Add
  • XQP550 EU Stage V Add
  • XQ230 Rental Power Add