Compare Equipment Go Back
Temporary Connection Boxes |
Engine Paralleling and Integration Control (EPIC) |
|
|
Technical Summary |
|||
---|---|---|---|
Application | EMERGENCY, LEGALLY REQUIRED EMERGENCY AND STANDBY | LV and MV (208V-27kV) | - |
Module Type | LUG-TO-LUG, CAMLOCK AND ENCLOSED CIRCUIT BREAKER | - | - |
Rated Power | 200 - 4000 AMPS | - | - |
Configuration | - | Remote modular paralleling control system (Master Control Panel for the first 2 generator sets and optional tie breaker, separate add-on control panels for up to 8 additional generator sets, utility paralleling control, and distribution control) | - |
Modes of Operation | - | Emergency Standby with redundant master control, Utility paralleling, peak shaving, and closed transition to/from Generator Power (with optional utility control panel) | - |
Generator Protective Devices |
|||
ANSI Protective Devices | - | 15/25. 27/59, 81 O/U, 32, 40, 90 (Industrial Grade) | - |
Utility Protective Devices |
|||
ANSI Protective Devices | - | 15/25. 27/59, 81 O/U, 32,47 (Industrial Grade) | - |
Environmental Parameters |
|||
Certifications | - | UL / cUL 508A | - |
Control Panel Enclosure | - | NEMA 12 | - |
Operating Temperature | - | 0°C to 55°C | - |
Storage Temperature | - | -20°C to 60°C | - |
Add a Similar Product: